Two closed bridges on Mississippi 198 in Columbia are scheduled to be replaced in January 2020 at an estimated cost of $10 million.
The Mississippi Department of Transportation is waiting for high water to go down to evaluate whether to make repairs to reopen the structures in the meantime, District 7 Engineer Albert White said.